CENTRAL SUPERFAST BROADBAND PROJECT - POSTCODE PHASING CHECKER

 
IMPORTANT NOTE
 
The indicated phasing is the BT/Openreach indicated situation at the start of their first project for the Central Superfast partnership. A number of errors have been identified over time eg areas wrongly advised as superfast or wrongly advised as ‘Already Basic’ (speeds > 2 Mbps). These errors will be picked up for subsequent projects. Also, it is likely that phasing and timings will change as survey work and/or implementation progresses and areas will be brought forward or pushed back as circumstances determine within the overall aim of delivering the maximum coverage with the resources available.   The Central Superfast project will provide more details and announcements as the deployment phase progresses.  Further information is available through our Frequently Asked Questions facility.

 

 
 
 
 

N.B.  Please check table for explanation of phasing

The following table explains the phasing. If more than one phase is indicated above it is because the postcode is served by a mix of infrastructure with differing upgrade expectations. Please note that the timing of phases is subject to change:

Phase

Meaning

Already Superfast

Superfast broadband indicated as already available or in suppliers’ commercial programmes. NB There are known gaps in this indicated coverage that will need to be addressed by other project work or in a Superfast Extension Project.

Phase 1

Deployment of Superfast Broadband infrastructure in this area is currently anticipated to be undertaken between July 2014 and December 2014.

Phase 2

Deployment of Superfast Broadband infrastructure in this area is currently anticipated to be undertaken between October 2014 and March 2015.

Phase 3

Deployment of Superfast Broadband infrastructure in this area is currently anticipated to be undertaken between January 2015 and June 2015.

Phase 4

Deployment of Superfast Broadband infrastructure in this area is currently anticipated to be undertaken between April 2015 and September 2015.

Phase 5

Deployment of Superfast Broadband infrastructure in this area is currently anticipated to be undertaken between July 2015 and December 2015.

Phase 6

Deployment of Superfast Broadband infrastructure in this area is currently anticipated to be undertaken between October 2015 and March 2016.

Phase 7

Deployment of Superfast Broadband infrastructure in this area is currently anticipated to be undertaken between January 2016 and June 2016.

Phase 8

Provision of infrastructure in 2016 to deliver a minimum of 2Mbps. The postcode may be considered further in a Superfast Extension Project.

Already Basic

Infrastructure is indicated as already available to provide a basic service (above 2 Mbps). The postcode may be considered further in a Superfast Extension Project.

 

 
Broadband Footer
eForms by AchieveForms